PROJECT DETAILS
RTC Project No. 0217001
RTC Project Manager (PM)
Amanda Callegari, P.E.
(775) 335-1881
acallegari@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax
Preliminary Design Firm: Jacobs Engineering Group
NEPA/Final Design Firm: To be determined
Construction Contractor: To be determined
PROJECT DESCRIPTION
The project includes operational improvements along Lemmon Drive from Fleetwood Drive to Ramsey Way. Elements of this project include resilience improvements to mitigate historical flooding issues.
LATEST NEWS
RTC completed an Alternatives Analysis Report for Segment 2 of the Lemmon Drive Roadway Project in August of 2022. After selecting the Natural Berm Alternative the project team completed preliminary design (30 percent design) in October of 2022. The RTC is currently working toward procurement of a consultant for final design and environmental services.
Lemmon Drive Segment 2 – Alternatives (Level 1)
Lemmon Drive Segment 2 – Alternatives (Level 2)
Lemmon Drive Segment 2 – 30% Preliminary Plans
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: 2020-2022
Final Design: 2023-2024
Construction: To be determined (based on funding)
FINANCIAL INFORMATION
Total Project Estimate: $39,000,000.00
Funding Source: RTC Fuel Tax
Post updated on: February 28, 2023
Lemmon Drive Segment 2 Traffic Improvements and Resiliency Project Map