PROJECT DETAILS
RTC Project No. 0244012
RTC Project Manager (PM)
Jessica Dover
(775) 335-1831
jdover@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
Design Firm: Eastern Sierra Engineering
Construction Contractor: To be determined
PROJECT DESCRIPTION
This project includes corrective pavement maintenance, including a segment of mill overlay and a segment of slurry seal on both Las Brisas Boulevard and Los Altos Parkway. Additional scope includes replacement of pedestrian ramps in the areas of mill and overlay.
LATEST NEWS
The contract for construction was awarded to Sierra Nevada Construction, Inc. (SNC) on August 9, 2023. Construction is anticipated to start in September 2023.
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Spring 2023
Final Design: Summer 2023
Construction: Summer/Fall 2023
FINANCIAL INFORMATION
Total Project Estimate: $ 5,298,930
Funding Source: RTC Fuel Tax
Post updated on: August 25, 2023
Las Brisas and Los Altos Resurfacing Map