PROJECT DETAILS
RTC Project No. 213001

RTC Project Manager (PM)
Andrew V. Jayankura, P.E., PTOE
(775) 332-2139
ajayankura@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: Kimley-Horn & Associates

Construction Contractor: to be determined

PROJECT DESCRIPTION
The project includes the re-striping and conversion of Kuenzli Street from the current one-way configuration, to a two-way street. The work is part of the pavement maintenance program.

  1. The two-way conversion of Giroux Street from E 2nd St to Kuenzli St
  2. The two-way conversion of Kuenzli Street from Giroux St to either Kirman Ave or Wells Ave (dependent of traffic analysis/study)
  3. The signal removal at Kuenzli Street and Locust Street
  4. General pavement Maintenance on Kirman Avenue from E 2nd St to just south of the Truckee River Bridge (south of Commercial St)

LATEST NEWS
Traffic analysis and study have been reviewed.  Conceptual design of the new two-way configuration is under development and scheduled for review mid-January.

SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: October 2019 – March 2020
Final Design: March 2020 – May 2020
Construction: Summer 2020

FINANCIAL INFORMATION
Total Project Estimate:
$1,000,000
Amount Approved: $1,000,000
Funding Source: RTC Fuel Tax

 

Post updated on: December 30, 2019