PROJECT DETAILS
RTC Project No. 247008

RTC Project Manager (PM)
Blaine Petersen
(775) 335-1871
bpetersen@rtcwashoe.com

RTC Engineering Department

(775) 348-0171
(775) 348-0170 fax

Design Firm: Atkins North America

Construction Contractor:  To be determined

PROJECT DESCRIPTION
Installation of fiber optic communication along Rock Boulevard, Road Weather Information System (RWIS) in northwest Reno, and installation of Performance Package up to 20 Gridsmart cameras to allow detection of pedestrian and bicycles. New fiber interconnect on Lake Street from 1st to 2nd and on Lemmon Drive from North Virginia to US 395 southbound on-ramp.

LATEST NEWS
Advertisement for construction January 2021 with bid opening scheduled for February 2021.

SCHEDULE
Preliminary Design: 2020
Final Design: Winter 2020
Construction: Summer 2021

FINANCIAL INFORMATION
Total Project Estimate:$ 1,000,000
Funding Source: Regional Road Impact Fees (RRIF)

 

Post updated on: December 28, 2020