PROJECT DETAILS
RTC Project No. 0744001
RTC Project Manager (PM)
Kimberly Diegle, P.E..
(775) 335-1844
kdiegle@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
Design Firm: To be determined
Construction Contractor: To be determined
PROJECT DESCRIPTION
The RTC is considering concepts and alternatives for a realignment connection of SR 341 Geiger Grade Road between the intersection of Toll Road and South Virginia Street based on the South Meadows Multimodal Transportation Study and the Mount Rose Corridor Study.
LATEST NEWS
RTC is in preliminary analysis stage of restarting the project. Evaluation of the procurement method for design and environmental services is underway.
SCHEDULE
Planning: Spring 2023 to Spring 2024
Environmental: To be determined
Preliminary Design: To be determined
Final Design: To be determined
Construction: To be determined
FINANCIAL INFORMATION
Total Project Estimate: $500,000
Funding Source: RTC Fuel Tax
Post updated on: August 25, 2023
Geiger Grade Road Realignment Project Map