PROJECT DETAILS
RTC Project No. 211005

RTC Project Manager (PM)
Maria Paz Fernandez, P.E.
(775) 335-1861
mpazfernandez@rtcwashoe.com

RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax

Design Firm: Headway Transportation

Construction Contractor: To be determined

PROJECT DESCRIPTION
Design and construct a two-way cycle track on Center Street from Moran Street to 9th Street. Traffic Signals update/ modification/ replacement along the corridor.  ADA improvements including pedestrian ramps. Corrective pavement from First Street to Ninth Street, and sidewalk replacement from Fifth Street to Ninth Street.

LATEST NEWS
The project is under Design. Working on Interlocal Cooperative Agreement with City of Reno to finalize 30% Design (preliminary design).

RTC Board update in August 2021.

Analysis of protected bicycle facilities are being performed along Virginia Street. Results will be shared with stakeholders and City of Reno to best decide next steps

SCHEDULE
Planning: April 2019
Environmental: N/A
Preliminary Design: Summer 2021
Final Design: Winter 2022
Construction: Summer 2023

FINANCIAL INFORMATION
Total Project Estimate: $13,000,000
Funding Source: RTC Fuel Tax

 

Post updated on: July 29, 2021