PROJECT DESCRIPTION
Roadway rehabilitation or reconstruction of Arrowcreek Parkway from S. Virginia Street to Rubblestone Drive. Construction work may include removal and replacement of the roadway structural section, sidewalk and curb and gutter replacement as necessary, reconstruction of existing curb ramps, traffic signal improvements, and other incidentals necessary for the rehabilitation and/or reconstruction of the street segment within the project limits.

LATEST NEWS
The consultant has completed the existing condition survey, topographic survey, and the preliminary right-of-way mapping. Pavement coring of the existing road and investigation is currently underway.

SCHEDULE
Planning: N/A
Environmental:
N/A
Preliminary Design:
Fall 2021 to Winter 2022
Final Design:
Summer 2022 to Fall 2022
Construction:
Spring 2023

FINANCIAL INFORMATION
Total Project Estimate: $2,640,000
Funding Source:
RTC Fuel Tax