PROJECT DETAILS
RTC Project No. 212073
RTC Project Manager (PM)
Kimberly Diegle, P.E..
(775) 335-1844
kdiegle@rtcwashoe.com
RTC Engineering Department
(775) 348-0171
(775) 348-0170 fax
Design Firm: Nichols Consulting Engineers
Construction Contractor: To be determined
PROJECT DESCRIPTION
Roadway reconstruction of Arrowcreek Parkway from South Virginia Street to 250 feet south of Rubblestone Drive and rehabilitation on Zolezzi Drive from Arrowcreek to Jeppson Lane. Construction work will include removal and replacement of the roadway structural section, sidewalk and curb and gutter replacement as necessary, reconstruction of existing curb ramps as necessary, traffic signal improvements, and other incidentals necessary for the reconstruction of the street segment within the project limits.
LATEST NEWS
The design team is in progressing to final design. The project is anticipated to advertise in March 2023.
SCHEDULE
Planning: N/A
Environmental: N/A
Preliminary Design: Completed
Final Design: Summer 2022 to Spring 2023
Construction: Summer 2023
FINANCIAL INFORMATION
Total Project Estimate: $2,640,000
Funding Source: RTC Fuel Tax
Post updated on: January 31, 2023
Arrowcreek Parkway Project Map