Road Projects

 

2011 Road Project Summary Reports

Summary reports are generated monthly by the RTC Engineering department for Pavement Repair Projects, Congestion Relief Projects, and Other Projects. Traffic Contol Reports are generated weekly. For up-to-date information on RTC projects, please click on the reports below: 

For the period of Januray 27 through February 24, 2012: 

Traffic Control Report current as of February 3, 2012:

2012 Pavement Reconstruction/Preservation Projects 

  • Alexander Lake Road (McCarran to end of pavement)
  • Bridge Street (Front to 3rd Street)
  • Caughlin Parkway (Longknife to McCarran)
  • Crummer Lane (S. Virginia to cul-de-sac)
  • Eastlake Boulevard (Various areas adjacent to WLSP)
  • East Nugget Avenue (McCarran to end of pavement)
  • Gentry Way (Terminal to Chris)
  • Green Acres Drive (S. Virginia to cul-de-sac)
  • Greenbrae Drive (El Rancho to Rock)
  • Huffaker Place (S. Virginia to cul-de-sac)
  • Hunter Lake Drive (Rondy to Plumb)
  • Kuenzli Street Truckee Bridge Deck
  • Lake Street (2nd to RETRAC)
  • Mayberry Drive (Truckee River to Canyon Drive)
  • Merchant Street (Sullivan to Clinic)
  • Neil Road (Moana/Airway to Gentry)
  • North Virginia Street (N. Security Circle to north of railroad crossing)
  • North Virginia Street (4th Street to 6th Street)
  • Orovada Street (City limits to Greenbrae)
  • Panther Court (Western Drive to 450 feet east of Panther Court)
  • Preventive Maintenance (Various Roads)
  • Snider Way (Stanford to Steneri)
  • South Stanford Way (Greg Street to McCarran)
  • Terminal Way (Gentry to Plumb)
  • West Huffaker Place (Del Monte to Spring Leaf)
  • Woodland Avenue / Sugar Pine Court (4th Street to end of pavement)

Capacity/Congestion Relief Projects 

  • Bicycle / Pedestrian Improvements 2 (10/11)
  • Geiger Grade Realignment (S. Virginia to Toll Road)
  • I-580 / Meadowood Interchange (Neil Road to S. Virginia / S. McCarran)                                             
  • Moana Lane Widening (Virginia to I-580 Ramps)
  • North Virginia / North McCarran Intersection (Sierra to N. McCarran)                                                   
  • Plumb Lane / Harvard Way ITS Intersection Improvement
  • Pyramid Way and McCarran Boulevard Intersection
  • Pyramid Highway / US 395 Connector EIS Study
  • Regional ITS Network Master Plan (Area wide)
  • Regional ITS Network Pilot Project (Area wide)
  • Regional ITS Network Phase 1 (Area wide)
  • Regional ITS Network Phase 2 Design (Area wide)
  • S McCarran Boulevard Project Phase I (Virginia to Mira Loma)
  • S McCarran Boulevard Project Phase II (Mira Loma to Greg Street)
  • SouthEast Connector
  • Traffic Engineering Spot Intersection Improvement 1 (10-11)
  • Traffic Engineering Spot Intersection Improvement 2 (11-12)
  • Traffic Signal Timing 2 (08/09)
  • Traffic Signal Timing 3 (09/10)
  • Vista Boulevard Soundwalls 

Other Projects 

  • LED Street Lights and LED Pedestrian Signals
  • Nichols Boulevard Bicycle / Pedestrian Improvements (E. Victorian to Howard)
  • Prater Way Enhancements (View to 22nd)
  • Regional Road Impact Fee Program Overview
  • RTC RAPID Stations Project
  • Sierra Street and North Virginia Street Bicycle / Pedestrian Improvements (9th Street to N. McCarran)
  • Sutro Street / Kirman Avenue Corridor Improvements (Mill to N. McCarran)
  • West Plumb Lane (Ferris to S. McCarran)

 

 

For additional information, please call the RTC Engineering Department at (775) 348-0171.